This project at SEPTA's Warmintser train station entailed the installation of two pre-fabricated janitorial huts along an active rail. Retaining the existing slope using the Redi-Rock wall system and construction of a concrete pad allowed the placement of the two structures. Both facilities had water and sanitary sewer service brought in, and the southern most structure also called for access stairs with railings and decorative safety fence. ABC Construction Company Inc., was the PRIME contractor for this project.