top of page
SEPTA
Woodland Station
The Woodland Station trench drain design/build project was created to capture water run off along the tracks that was eroding the track bed and neighboring properties. ABC Construction was asked to come up with a solution to fix the issue. Our design team engineered the drians and our field personal installed the system. 48 Pre-cast concrete trench drains were cast to our specifications and installed during weekend off-peak hours using alternating crews around the clock.
Woodland South
Woodland North
bottom of page